Color: [0, 77, 168, 255] Background Color: N/A Outline Color: N/A Vertical Alignment: baseline Horizontal Alignment: left Right to Left: false Angle: 0 XOffset: 0 YOffset: 0 Size: 10 Font Family: Arial Font Style: normal Font Weight: normal Font Decoration: none
Description: HS2 Interim Preliminary Design, August 2013, containing the Down Main Line to Handsacre, Down lines for the Birmingham Spur and North Chord, Down Lines for Leeds and Manchester Spurs + HS2-HS1 Link alignment attributed with the Design Element Type configuration.This is the alignment that the Phase One Environmental Statement 2013 is based upon.
Description: HS2 Phase One No Net Loss pre-construction linear features (hedgerows and watercourses) data. Please refer to the No net loss in biodiversity - Methodology and interim results report published on www.gov.uk for more information.
Description: HS2 Phase One No Net Loss pre-construction linear features polygon data. Please refer to the No net loss in biodiversity - Methodology and interim results report published on www.gov.uk for more information.
Description: HS2 Phase One No Net Loss post construction linear features (hedgerows and watercourses) data. Please refer to the No net loss in biodiversity - Methodology and interim results report published on www.gov.uk for more information.
Description: HS2 Phase One No Net Loss post construction polygonfeatures data. Please refer to the No net loss in biodiversity - Methodology and interim results report published on www.gov.uk for more information.
Description: HS2 Phase 1 Extended Homeowner Protection Zones August 2016. For More information on the Safeguarding and the associated maps please visit https://www.gov.uk/government/organisations/high-speed-two-limited. This data is released under the Open Government License agreement.
Description: HS2 Phase 1 Safeguarding Zones August 2016. The data is split into Surface, Sub-Surface and overall limits of Safeguarding. Refer to fields for details about sections. For More information on the Safeguarding and the associated maps please visit https://www.gov.uk/government/organisations/high-speed-two-limited. This data is released under the Open Government License agreement
Description: HS2 Phase 1 Zoned Property Schemes August 2016. The data contains the Rural Support Zone and three outer bands, extending to 300m. These bands were created in 60m intervals from the Phase 2a: West Midlands to Crewe rail alignment which is available at data.gov.uk. Outer bands are referred to as 'Home Owner Payment' (HOP) zones. For More information on the Property Schemes and the associated maps please visit https://www.gov.uk/government/organisations/high-speed-two-limited. This data is released under the Open Government License agreement